Arrium Iron Knight

Projects

Modular Plant
Iron Ore

  • Plant Type - Modular Plant
  • Company - Arrium Iron Knight (BIS Industries)
  • Installation - Installed in 2009
  • Location - Located in Whyalla – South Australia
  • Design - Designed for 450TPH production of lump and fines Iron Ore
  • Operation - Operating in +20 degrees to +55 degree
  • System - Primary, Dual Secondary and triple screening station

Project Gallery

Modular Plant Iron Ore

Portable MAX Plant set up to produce lump and fines iron ore at a rate of 350TPH, including the unique MAX Plant portable jack up horizontal screens. The stacking conveyors where set up on Islands to give an increased capacity in the stockpile volumes.

  • Plant Type - Modular Plant
  • Company - Arrium - Iron Knight (BIS Industries)
  • Installation - Installed in 2009
  • Location - Located in Whyalla – South Australia
  • Design - Designed for 450TPH production of lump and fines Iron Ore
  • Operation - Operating in +20 degrees to +55 degree
  • System - Primary, Dual Secondary and triple screening station

Project Gallery [Arrium Iron Knight]

ARRIUM IRON KNIGHT

MORE PROJECT

HWE NEWMAN
HWE Newman
2007 – Iron Ore
ARRIUM IRON WIRRIDA
Arrium Iron Wirrida
2012 – Iron Ore
WA BLUEMETAL KARRATHA
WA Bluemetal Karratha
2013 – Aggregates
RIO TINTO COAL
Rio Tinto

2013 – Coal

MORE PROJECTS

MAX Plant ARRIUM IRON KNOB
Arrium Mining
2015 – Iron Ore
BIS INDUSTRIES(Rental)
BIS Industries
2012 – Iron Ore
WETAR COPPER HEAP LEACH
Pt Batutua Tembaga Raya
2015 – Copper Ore
RIO TINTO COAL
RIO Tinto
2013 – Coal