MAX Plant is an Australian mineral processing plant manufacturer, designing and delivering equipment and complete systems for mining and quarry operations.
Our capability covers crushing, screening, feeding, conveying, stockpiling and sampling, from individual equipment through to fully integrated mobile, modular and fixed plants. Each solution is developed around the material, site conditions and production requirements.
______
MAX Plant is an Australian designer and manufacturer of mineral processing equipment and complete plant systems.
We engineer solutions around the material, process, site conditions and required product, from individual crushers, screens, feeders and conveyors through to integrated crushing, screening, stockpiling and sampling systems.
Our equipment is designed for mining and quarry operations where reliability, practical maintenance and long-term plant performance matter.
___
Equipment and circuits designed around material characteristics and required product sizes.
___
Material handling systems engineered to control flow and connect the complete process.
___
Integrated solutions for product handling, storage and representative sampling.
___
Mobile, modular and fixed plant configurations engineered as one connected process.
______
MAX Plant combines Australian engineering with local manufacturing capability to keep design, production and project support closer to the operation. Working closely across engineering, fabrication and commissioning allows us to respond to project requirements without separating the equipment from the process it was designed to perform.
______
MAX Plant was established in Western Australia in 1998, building on decades of experience in crushing, screening and materials processing.
That experience continues to shape how we approach plant design today. Practical equipment, accessible maintenance and systems engineered around how material actually moves through an operation.
From Australian quarry applications to large-scale mineral processing projects, the focus remains the same: understand the process first, then engineer the equipment around it.
01
UNDERSTAND
___
Material characteristics, feed conditions, location, climate, required products and operational objectives.
02
ENGINEER
___
Develop the equipment configuration, flowsheet and material handling arrangement around the process.
03
BUILD
___
Manufacture and integrate the equipment with consideration for transport, installation, operation and maintenance.
04
SUPPORT
___
Commissioning, technical support and ongoing OEM knowledge throughout the operating life of the plant.
___
Talk to MAX Plant about the material, throughput, products and site conditions driving your project.