BHP MACA Limited

Projects

Fixed Plant
Iron Ore

  • Plant Type - Fixed Plant
  • Company - BHP MAC (MACA Limited)
  • Installation - Installed in 2019
  • Location - Located in Pilbara – Western Australia
  • Design - Designed for 2150TPH
  • Operation - Operating in +5 degrees to +55 degree
  • System - Primary, Dual Secondary and triple screening station, complete with sample stations and interlocking conveyor to clients info structure

Project Gallery

Fixed Plant Iron Ore

  • Plant Type - Fixed Plant
  • Company - BHP MAC (MACA Limited)
  • Installation - Installed in 2019
  • Location - Located in Pilbara – Western Australia
  • Design - Designed for 2150TPH
  • Operation - Operating in +5 degrees to +55 degree
  • System - Primary, Dual Secondary and triple screening station, complete with sample stations and interlocking conveyor to clients info structure

Project Gallery [BHP MACA Limited]

BHP MACA Limited 1
BHP MACA Limited 2
BHP MACA Limited 3

MORE PROJECT

HWE NEWMAN
HWE Newman
2007 – Iron Ore
ARRIUM IRON WIRRIDA
Arrium Iron Wirrida
2012 – Iron Ore
WA BLUEMETAL KARRATHA
WA Bluemetal Karratha
2013 – Aggregates
RIO TINTO COAL
Rio Tinto

2013 – Coal

MORE PROJECTS

MAX Plant ARRIUM IRON KNOB
Arrium Mining
2015 – Iron Ore
BIS INDUSTRIES(Rental)
BIS Industries
2012 – Iron Ore
WETAR COPPER HEAP LEACH
Pt Batutua Tembaga Raya
2015 – Copper Ore
RIO TINTO COAL
RIO Tinto
2013 – Coal